Kincardine – 275KV GIS Building & Balance of Plant

Kincardine – 275KV GIS Building & Balance of Plant

Building
Power Solutions

Kincardine substation was identified as being at risk from flooding during a number of storm events, it is therefore proposed the sub-station is re-built

Read More

East Anglia One – 400KV Onshore Substation

East Anglia One – 400KV Onshore Substation

Civil Engineering

This project involved the construction of a new GIS building for the new East Anglia One offshore wind farm.

Read More

Penicuik Public Realm Environment Works

Penicuik Public Realm Environment Works

Civil Engineering

Part of the wider Penicuik Heritage Regeneration project, the aim of this project was to improve the appearance of the High Street and to make it safer and more comfortable for pedestrians.

Read More

Falkirk – Memorial Wall

Falkirk – Memorial Wall

Civil Engineering

NRS were contracted to demolish & existing wall within Falkirk Cemetery & Crematorium and construct a new memorial wall,

Read More

Camlachie Burn – Watercourse Diversion

Camlachie Burn – Watercourse Diversion

Civil Engineering

The Camlachie Burn site at Biggar Street included the proposed off-line replacement of some 185m of watercourse.

Read More

Dinkley Footbridge

Dinkley Footbridge

Civil Engineering
Turnkey

Demolition of the existing footbridge superstructure and abutments and the design and construction of a replacement steel truss deck together with new abutments and modification of the existing main piers.

Read More

Sauchiehall Street

Sauchiehall Street

Civil Engineering

The project aim was to dig a series of trial pits or trenches along Sauchiehall Street & Cambridge Street in Glasgow City Centre, to map out the services along these areas.

Read More

Branxton

Branxton

Civil Engineering
Power Solutions

The Contract consisted of a combined Civils and Balance of Plant contract to install new foundations, structures, 400kV surge arresters, PTI’s and cable sealing ends in the Torness – Branxton 400kV circuits at Branxton 400kV substation.

Read More

Wishaw Substation

Wishaw Substation

Civil Engineering

The civil works were planned on a staged basis over a period of 4 years utilising available circuit outages subject to the Electricity Network constraints.

Read More

East Anglia One Operations & Maintenance Base

East Anglia One Operations & Maintenance Base

Building
Offices
Turnkey

This contract was for the Design and Build of an O&M building. The building houses open plan office space, meeting rooms, a marine coordination office, SCADA and control room, welfare functions, changing and showering facilities and warehousing.