Angle DC –  33KV MVDC Convertor Station Building

Angle DC – 33KV MVDC Convertor Station Building

Building
Civil Engineering

Civil enabling and building works for the supply and construction of MVDC converter station buildings.

Read More

NNG Crystal Rig – 400KV Balance of Plant

NNG Crystal Rig – 400KV Balance of Plant

Power Solutions

The contract scope for these Balance of Plant works required at Crystal Rig 400kV substation was to facilitate the Neart Na Gaoithe offshore windfarm connection.

Read More

Boolard Windfarm

Boolard Windfarm

Civil Engineering
Renewables
Turnkey

The design and construction of all civil & balance of plant works for a 2 Wind Turbine farm in County Cork, Ireland.

Read More

Seagreen Offshore Windfarm (Onshore Substation Civils)

Seagreen Offshore Windfarm (Onshore Substation Civils)

Civil Engineering
Renewables

This was another significant award for NRS within the Offshore Wind sector for the onshore substation civils package for the Seagreen Offshore Windfarm

Read More

Old Mill Windfarm

Old Mill Windfarm

Renewables
Turnkey

The Old Mill Wind Farm project was located in the townlands of Carrickatee and Lisduff in County Monaghan, approximately 9km south-west of Castleblayney town

Read More

Llynfi Afan

Llynfi Afan

Civil Engineering
Renewables
Turnkey

This project involved the design and construction of all civil and electrical works for a new 12 turbine wind farm. The turbines supplied were Gamesa G80 wind turbines with a tower height of 78m.

Read More

Mossmoran – 132KV Balance of Plant

Mossmoran – 132KV Balance of Plant

Power Solutions

NRS Group were required to supply, handle, install, test & commission all equipment

Read More

Erskine – 132KV Transformer Replacement Balance of Plant

Erskine – 132KV Transformer Replacement Balance of Plant

Power Solutions

Erskine 132kV substation was commissioned in 1972 and has been in continual service since without having any major upgrades. All associated primary equipment remains the same as originally installed at the time of the grid transformers.

Read More

Shrubhill – 275KV Transformer Replacement

Shrubhill – 275KV Transformer Replacement

Power Solutions

SGT2 was commissioned in 1969 and was fitted with a masonry noise & fire enclosure. This was replaced by like for like 120MVA grid transformer including new noise & fire enclosures.

Read More

Smeaton – Shunt Reactors Modernisation BoP

Smeaton – Shunt Reactors Modernisation BoP

Power Solutions

The RIIO‐T1 shunt reactor modernisation programme has identified the need to replace the existing oil filled shunt reactors (R1 & R2) at Smeaton 400/275/132kV substation.

Read More

Got Questions?

Whatever your project, contact the team at the NRS Group to see how we can aid you and your development.