Projects

Projects

We’ve worked with numerous companies across a wide range of sectors. Read our case studies to get a feel of what we can achieve for you.

Lister Drive Stability Balance of Plant

Lister Drive Stability Balance of Plant

Civil Engineering
Power Solutions

The Lister Drive Stability Plant project will provide inertia and reactive power to stabilise the National Electricity Transmission System (NETS).

Read More

Glenlee – 132KV Civils & Balance of Plant

Glenlee – 132KV Civils & Balance of Plant

Civil Engineering
Power Solutions

The works at Glenlee form part of the Kendoon to Glenlee Reinforcement, which includes the extension of the 132kV network in south west Scotland.

Read More

NNG Crystal Rig – 400KV Balance of Plant

NNG Crystal Rig – 400KV Balance of Plant

Power Solutions

The contract scope for these Balance of Plant works required at Crystal Rig 400kV substation was to facilitate the Neart Na Gaoithe offshore windfarm connection.

Read More

Mossmoran – 132KV Balance of Plant

Mossmoran – 132KV Balance of Plant

Power Solutions

NRS Group were required to supply, handle, install, test & commission all equipment

Read More

Erskine – 132KV Transformer Replacement Balance of Plant

Erskine – 132KV Transformer Replacement Balance of Plant

Power Solutions

Erskine 132kV substation was commissioned in 1972 and has been in continual service since without having any major upgrades. All associated primary equipment remains the same as originally installed at the time of the grid transformers.

Read More

Shrubhill – 275KV Transformer Replacement

Shrubhill – 275KV Transformer Replacement

Power Solutions

SGT2 was commissioned in 1969 and was fitted with a masonry noise & fire enclosure. This was replaced by like for like 120MVA grid transformer including new noise & fire enclosures.

Read More

Smeaton – Shunt Reactors Modernisation BoP

Smeaton – Shunt Reactors Modernisation BoP

Power Solutions

The RIIO‐T1 shunt reactor modernisation programme has identified the need to replace the existing oil filled shunt reactors (R1 & R2) at Smeaton 400/275/132kV substation.

Read More

Kincardine – 275KV GIS Building & Balance of Plant

Kincardine – 275KV GIS Building & Balance of Plant

Building
Power Solutions

Kincardine substation was identified as being at risk from flooding during a number of storm events, it is therefore proposed the sub-station is re-built

Read More

Branxton

Branxton

Civil Engineering
Power Solutions

The Contract consisted of a combined Civils and Balance of Plant contract to install new foundations, structures, 400kV surge arresters, PTI’s and cable sealing ends in the Torness – Branxton 400kV circuits at Branxton 400kV substation.

Read More

Got Questions?

Whatever your project, contact the team at the NRS Group to see how we can aid you and your development.

Contact Us